The work under this contract consisted of the reconstruction of Interchange 100 of the Garden State Parkway. Roadway work included the widening of existing Northbound and Southbound roadways within the interchange area, and the relocation and reconstruction of N.J. State Route 33 and 66. Included with the roadway work was clearing, grading, reconstruction and construction of new drainage facilities, guide rail installation, traffic signals and lighting. Also included in this contract were the embankments, ramps and roadway modifications to match the new alignment.
The drainage construction included an extension and repair of an existing box culvert under the relocated Rt. 66. This extension included a stress relief platform. The platform is made up of concrete footings, prestressed concrete beams, precast end walls and a cast-in-place deck slab.
The bridge work for this contract included the demolition of the four existing structures. The existing bridge abutments were removed by the use of explosives during nighttime highway shutdown periods.
The four new single span structures were constructed on pile supported conventional concrete abutments and piers. The spans consisted of reinforced concrete deck slabs on hybrid steel plate girders.
This project was constructed on time and within budget.